📋 Objectives for This Stage
- Schedule and coordinate all required municipal inspections at appropriate construction stages
- Ensure all work passes inspection requirements and obtain necessary pass certificates
- Manage any inspection failures and coordinate corrective actions with the contractor
- Coordinate specialized testing (soil, concrete, steel) as required by authorities
- Maintain comprehensive inspection records for final certification requirements
⚙️ Standard Operating Procedure (SOP)
-
Inspection Schedule Management
Maintain a master inspection schedule aligned with construction milestones and coordinate timing with municipality.
Details:- Book inspections 48-72 hours in advance
- Responsible: PRO & Site Engineer
-
Pre-Inspection Preparation
Conduct pre-inspection with contractor to ensure all work is ready and compliant before official inspection.
Details:- Create pre-inspection checklist for each stage
- Responsible: Site Engineer
-
Municipal Inspection Coordination
Accompany municipal inspectors, provide required documentation, and record inspection results and comments.
Details:- Have all relevant drawings and certificates available on-site
- Responsible: Site Engineer & PRO
-
Failed Inspection Management
For any inspection failures, immediately coordinate with contractor to address issues and reschedule re-inspection.
Details:- Document failure reasons and corrective actions taken
- Responsible: Site Engineer
-
Testing Coordination
Arrange for specialized testing services (concrete strength, MEP testing, etc.) and ensure results meet specifications.
Details:- Coordinate with approved testing laboratories
- Responsible: Site Engineer