📋 Objectives for This Stage

  • Prepare a complete set of 'Issued for Construction' (IFC) drawings with all necessary details
  • Develop comprehensive technical specifications and material schedules
  • Create a competitive tender package for contractor selection
  • Assist the client in evaluating contractor proposals and selecting the best bid
  • Finalize the construction contract and ensure all parties are aligned on project scope

⚙️ Standard Operating Procedure (SOP)

  1. Finalize Construction Drawings

    Update all architectural drawings to 'IFC' status, incorporating any changes from the approved permit set.

    Details:
    • Include detailed sections, elevations, and construction details
    • Responsible: Design Team
  2. Coordinate Final Engineering Drawings

    Ensure all structural, MEP, and civil drawings are updated and fully coordinated with architectural plans.

    Details:
    • Conduct final clash detection and resolve conflicts
    • Responsible: Project Architect & Engineers
  3. Prepare Technical Specifications

    Develop comprehensive specifications document covering all materials, finishes, and construction methods.

    Details:
    • Use ACAD-SPEC-001 template as the base document
    • Responsible: Project Architect
  4. Create Tender Package

    Compile all construction documents, specifications, and contract terms into a comprehensive tender package.

    Details:
    • Include detailed scope of work and performance requirements
    • Responsible: Project Architect
  5. Contractor Selection Process

    Issue tender to pre-qualified contractors, manage the bidding process, and assist client with contractor selection.

    Details:
    • Evaluate technical and commercial proposals against project criteria
    • Responsible: Project Architect